Zeal Engineering Consultants (Pty) Ltd, was appointed to implement Ferrum-Gamagara 132kV Loop-in Loop-out Line on behalf of Eskom Northern Cape Operating Unit.
The scope of work comprised the following:
​
-
Build the 0.6km Tern 132kV line from Ferrum MTS to Gamagara S/S:
-
The Gamagara Munisipaliteit 132kV line will be constructed on double circuit
-
String OPGW in parallel with Wolf earth wire.
-
Supply and stringing of OPGW by sub-contractor (Golden Dynasty).
-
Line deviation as per the revised design, stays repositioning,